Groundworks team installed removed existing damaged drainage channel and installed new ACO drain.

RECENT JOBS

Groundworks

Attended commercial property, lifted slabs causing trip hazards and relayed them on a bed of fresh sharp sand. Removed loose kerb stone and relayed in rapid set concrete, topped with cold lay and bitumen spray.

2022-02-14T18:54:09+02:00
Go to Top