Our reactive maintenance team attended an industrial park in order to remove damaged barbed wire and broken brackets from a barbed wire fence topping and supply and install approx 33m of 3 row barbed wire and new brackets where required in order to mitigate a security risk.
RECENT JOBS
Installation of roof railing
Installation of roof railing following health and safety review.
Installation of stair nosing
Installation of stair nosing at retail centre to prevent health and safety hazard.
Installation of floodlights and electrical testing
Installation of floodlights and electrical testing.
Replacement of Loose Slabs
Groundwork replacement of loose slabs at commercial office to prevent health and safety risk.
Filling of Pothole
Filling of pothole with cold tarmac to prevent trip hazard and standing water build up.
Installation of motion sensor and external light
Installation of external light and motion sensor for commercial building.