Our reactive maintenance team attended an industrial park in order to remove damaged barbed wire and broken brackets from a barbed wire fence topping and supply and install approx 33m of 3 row barbed wire and new brackets where required in order to mitigate a security risk.
RECENT JOBS
Ensuring Christmas Happens
Visited site to ensure that all Christmas light sockets were operational!
Installation of Gate
Fabrication and installation of new double leaf gate.
Pre-Christmas Refresh
Painting of bike racks and handrails ready for Christmas shopping at retail centre
Sign Clean
Cleaning of sign at entrance to industrial park.
Winter Preparations
In preparation for winter - drains cleared and over hanging trees branches cut back to prevent leaves falling into drains.
Emergency Repair
Emergency 2 hour repair to damaged height restrictor at Oxford retail park.