Our preventative maintenance team attended a central London office building to
Remove all 5 existing hatches.
Install new MF ceiling where it has been cut out.
Install new 100mm insulation where the old has been removed.
Plasterboard using 15mm soundboard and 12.5mm plasterboard to match the existing.
Cut out plasterboard and install 5 new 1200mm x 600mm access hatches.
RECENT JOBS
Groundworks
Attended retail car park and removed damaged bollards. Supplied and fitted new concrete bollards.
Decorating
Attended commercial office and prepared areas for decorating.
Flat Roof Works
Attended commercial building and carried out roof repairs. Added extra pipework to divert water, repaired flashing and coated entire flat roof with liquid rubber.
External Decorating
Attended office car park and repainted the middle island of the car park entrance.
Electrical
Electrician attended commercial building to find no power supply to led light fixture.