Installation of new roof hatches

Installation of new roof hatches

Our preventative maintenance team attended a central London office building to
Remove all 5 existing hatches.
Install new MF ceiling where it has been cut out.
Install new 100mm insulation where the old has been removed.
Plasterboard using 15mm soundboard and 12.5mm plasterboard to match the existing.
Cut out plasterboard and install 5 new 1200mm x 600mm access hatches.

RECENT JOBS

Groundworks

Groundworks team attended retail park in Peterborough to replace aco drain and channel. Broke out existing drain and channel and supplied and fitted new.

Groundworks

Groundwork team attended commercial car park to reset corner stone. Cleaned all old mortar from stone and cleaned base. Reset with new mortar.

Electrical

Electrician attended site and gained access to distribution board and found breaker had tripped. Reset breaker and checked lights.