Our preventative maintenance team attended a central London office building to
Remove all 5 existing hatches.
Install new MF ceiling where it has been cut out.
Install new 100mm insulation where the old has been removed.
Plasterboard using 15mm soundboard and 12.5mm plasterboard to match the existing.
Cut out plasterboard and install 5 new 1200mm x 600mm access hatches.
RECENT JOBS
Liquid resin treatment for roof
We attended a commercial premises for applying a liquid resin treatment to prevent water ingress.
Internal refurbishment
Our refurbishment team attended a commercial building.
Roof survey
Due to water ingress we carried out a detailed inspection.
Canteen refurbishment
Following a fire risk assessment that identified a hatch that was not fire rated our team attended and removed the hatch and replaced with one that met fire rating standards.
Drainage channel replacement
Our groundworks team attended a commercial premises.
Lock Change
Our reactive maintenance team attended a commercial premises due to a broken lock preventing access.