Our preventative maintenance team attended a central London office building to
Remove all 5 existing hatches.
Install new MF ceiling where it has been cut out.
Install new 100mm insulation where the old has been removed.
Plasterboard using 15mm soundboard and 12.5mm plasterboard to match the existing.
Cut out plasterboard and install 5 new 1200mm x 600mm access hatches.
RECENT JOBS
Groundworks
Our groundworks team reset and concreted in two bollards at an industrial site where HGVs had been colliding with the bollards previously.
Electrical Works
Our electrical installation team were asked to attend a business park to check the installation of a number of internal and external LED lights.
Roof Repairs
We attended a site at a commercial business park to carry out a brief roof inspection and then remedial works as considered necessary due to water ingress.
Office Decoration
Our planned maintenance team decorated an empty office as part of a refurbishment programme.
Graffiti Removal
Our reactive maintenance team attended an industrial site to remove graffiti.
Installation of solar bollards
Following a health and safety review our groundworks team attended an industrial site and installed solar powered bollards.