Our preventative maintenance team attended a central London office building to
Remove all 5 existing hatches.
Install new MF ceiling where it has been cut out.
Install new 100mm insulation where the old has been removed.
Plasterboard using 15mm soundboard and 12.5mm plasterboard to match the existing.
Cut out plasterboard and install 5 new 1200mm x 600mm access hatches.
RECENT JOBS
Collapsed Manhole Cover
Our groundworks team attended an industrial park in order to repair frame and cover of collapsed manhole highlighted by a health and safety review. .
Wall construction and handrail replacement
Our groundworks team visited an industrial park in order to reconstruct a damaged wall and replace and reattach a handrail.
Health and Safety Job
Following a health and safety survey our preventative maintenance team were asked to highlight potential hazards at a commercial building to reduce the risk of accidents.
Decoration
Out of hours planned maintenance of stud wall construction and paining to improve the layout of office in a commercial building.
Wall Construction
Reactive maintenance - our groundworks team attended a business park to reconstruct a wall that had been damaged by a vehicle, reusing existing brickworks where possible.