Our preventative maintenance team attended a central London office building to
Remove all 5 existing hatches.
Install new MF ceiling where it has been cut out.
Install new 100mm insulation where the old has been removed.
Plasterboard using 15mm soundboard and 12.5mm plasterboard to match the existing.
Cut out plasterboard and install 5 new 1200mm x 600mm access hatches.
RECENT JOBS
Fence Repair
Repair of fence that was presenting a health and safety hazard.
Liquid resin treatment
Liquid resin treatment to fascia and gutter
Electrical Repair of Entrance Control
Reactive maintenance to repair entrance control to office car park to ensure no security problems.
Installation of Protective Bollards
Planned maintenance work to install parking bollards to act as a safety barrier to prevent health and safety risk to pedestrians.
Painting of Hoarding Board
Painting of a security hoarding
Replacement of Flat Roof
Replacement of flat commercial roof as part of a preventative maintenance programme