Our preventative maintenance team attended a central London office building to
Remove all 5 existing hatches.
Install new MF ceiling where it has been cut out.
Install new 100mm insulation where the old has been removed.
Plasterboard using 15mm soundboard and 12.5mm plasterboard to match the existing.
Cut out plasterboard and install 5 new 1200mm x 600mm access hatches.
RECENT JOBS
Emergency Repair
Emergency 2 hour repair to damaged height restrictor at Oxford retail park.
Bollard Repair
Repair of damaged raised bollard.
Gutter Clearance
It is obviously important that gutters are kept clear in autumn to prevent water ingress.
Fire Strips
Installation of intumescent strips on fire doors post a Fire Risk assessment.
Refresh of external entrance areas
Pressure washing and sealing of cracks can give external areas an aesthetic uplift.