Our preventative maintenance team attended a central London office building to
Remove all 5 existing hatches.
Install new MF ceiling where it has been cut out.
Install new 100mm insulation where the old has been removed.
Plasterboard using 15mm soundboard and 12.5mm plasterboard to match the existing.
Cut out plasterboard and install 5 new 1200mm x 600mm access hatches.
RECENT JOBS
Installation of knee rail fencing
Our carpentry team attended a retail park in order to install a wooden knee fence to prevent footfall through a ’shortcut’ with potential health and safety consequences.
Install wooden ramp
Our carpentry team attended an industrial site in oder to replace a widen ramp that had been highlighted in a health and safety review.
Fire stopping
Fire stopping / fire door team attended a commercial office building.
Bollar refurbishment
Our decorating team attended an industrial park in order to refurbish 36 bollards - a mix of metal and concrete.
Drain repair
Our reactive team attended a retail park in order to replace a water meter cover that was a potential health and safety risk.