Installation of ramp at office building as part of planned maintenance review following a heath and safety audit. Ramp consisted of a Plywood skeleton and then overclad with a single sheet of Chequer plate folded at each end.

RECENT JOBS

Groundworks

Attended commercial property, lifted slabs causing trip hazards and relayed them on a bed of fresh sharp sand. Removed loose kerb stone and relayed in rapid set concrete, topped with cold lay and bitumen spray.

2019-08-05T22:25:27+02:00
Go to Top