Installation of ramp at office building as part of planned maintenance review following a heath and safety audit. Ramp consisted of a Plywood skeleton and then overclad with a single sheet of Chequer plate folded at each end.
RECENT JOBS
Repair of ‘Bollard Light’
Having bollards and lights securely fixed prevents vandalism and increased reactive costs.
Tap Replacement
Replacement of tap - we’re happy to help however small the job.
Investigation of water ingress
Often blocked gutters can cause significant problems, these can be avoided by performing regular gutter clearance.
Decoration of Stairwell
Decoration of stairwell.
Earth Works
Is your site secure from unwanted visitors? The construction of a trench to prevent unauthorised caravans/vehicles from entering.
Ensuring Christmas Happens
Visited site to ensure that all Christmas light sockets were operational!







