Installation of ramp at office building as part of planned maintenance review following a heath and safety audit. Ramp consisted of a Plywood skeleton and then overclad with a single sheet of Chequer plate folded at each end.
RECENT JOBS
Perimeter Fence
Installation of perimeter fencing
Installation of Bollards
Installation of Bollards.
Lighting Ornamental Stone
Lighting the ornamental stone bearing a shopping centre name.
External Steps
Repair of step to remove trip hazard.
Steel Edge Protection
Installation of plant, edge and isolation switch protection and gates.