Following a health and safety review our groundworks team attended an industrial site and installed solar powered bollards.

RECENT JOBS

Groundworks

Attended commercial property, lifted slabs causing trip hazards and relayed them on a bed of fresh sharp sand. Removed loose kerb stone and relayed in rapid set concrete, topped with cold lay and bitumen spray.

2019-12-01T11:00:14+02:00
Go to Top