Following a health and safety review our groundworks team attended an industrial site and installed solar powered bollards.

RECENT JOBS

Decorating

After a number of leaks our decorating team attended a commercial building to redecorate the staircases and landings. Initially stain block was applied followed by two coats of matt emulsion.

2019-12-01T11:00:14+02:00
Go to Top