Installation of steel parking bollards to separate pedestrians at retail centre to meet health and safety requirements as part of planned preventative maintenance.

RECENT JOBS

Groundworks

Attended commercial property, lifted slabs causing trip hazards and relayed them on a bed of fresh sharp sand. Removed loose kerb stone and relayed in rapid set concrete, topped with cold lay and bitumen spray.

2019-05-21T11:47:02+02:00
Go to Top