Our refurbishment team attended a commercial office building to carry out redecoration whilst the office had low volume due to home working. They
– prepared walls behind Main Reception for decoration
– raked out all cracks on walls and filled all damages
– sanded and dusted off all filled areas
– painted walls behind Main Reception with 2 coats of existing light grey wall emulsion
– prepared skirting boards behind Main Reception for decoration
– filled skirting where necessary, sanded and dusted off filled areas
– painted skirting with 2 coats of white acrylic eggshell paint
– protected and cleaned entire working areas
RECENT JOBS
Liquid resin treatment for roof
We attended a commercial premises for applying a liquid resin treatment to prevent water ingress.
Internal refurbishment
Our refurbishment team attended a commercial building.
Roof survey
Due to water ingress we carried out a detailed inspection.
Canteen refurbishment
Following a fire risk assessment that identified a hatch that was not fire rated our team attended and removed the hatch and replaced with one that met fire rating standards.
Drainage channel replacement
Our groundworks team attended a commercial premises.
Lock Change
Our reactive maintenance team attended a commercial premises due to a broken lock preventing access.