Our refurbishment team attended a commercial office building to carry out redecoration whilst the office had low volume due to home working. They
– prepared walls behind Main Reception for decoration
– raked out all cracks on walls and filled all damages
– sanded and dusted off all filled areas
– painted walls behind Main Reception with 2 coats of existing light grey wall emulsion
– prepared skirting boards behind Main Reception for decoration
– filled skirting where necessary, sanded and dusted off filled areas
– painted skirting with 2 coats of white acrylic eggshell paint
– protected and cleaned entire working areas
RECENT JOBS
Refurbishment of external areas
Our planned maintenance team attended a commercial property to refurbish some of the outside areas.
Plumbing Installation
Our plumbing team attended a commercial building in order to adapt existing pipework, install a cold water feed tape and adapt the waste removal pipe in order to allow the installation of a a dishwasher.
Roof Edge Protection
Our preventive maintenance team attended a commercial building as a health and safety report had indicated that the roof edging should be increased in height. Using safety harnesses the team dismantled the existing structure and resembled to meet the height requirement.
Car Park Barriers
Our planned maintenance team attended a retail park in response to a health and safety survey which had indicated that vehicle barriers appeared to be damaged and in disrepair. Our team dug out and replaced two barriers, reset three others and painted all including cutting back hedges that obscured.
Wooden Flooring Repair
Our carpentry team attended in order to repair wooden flooring at the request of tenant. It was found that runs were loosely fitted and so were refitted to satisfaction of tenant.
Replacement of internal doors
Our decorating team replaced doors leading onto stair case from second floor lobby and painted with 1 coat of undercoat and 2 top coats gloss