Our refurbishment team attended a commercial office building to carry out redecoration whilst the office had low volume due to home working. They
– prepared walls behind Main Reception for decoration
– raked out all cracks on walls and filled all damages
– sanded and dusted off all filled areas
– painted walls behind Main Reception with 2 coats of existing light grey wall emulsion
– prepared skirting boards behind Main Reception for decoration
– filled skirting where necessary, sanded and dusted off filled areas
– painted skirting with 2 coats of white acrylic eggshell paint
– protected and cleaned entire working areas
RECENT JOBS
Installation of solar bollards
Following a health and safety review our groundworks team attended an industrial site and installed solar powered bollards.
Gully and drain cleaning
As part of a planned maintenance programme our team visited a commercial building and cleared all act channels and covers, all gutters and other floor drainage.
Refurbishment of flat
Refurbishment of a residential flat above commercial for an investor
Emergency patchwork repairs to roof
Following heavy rains our reactive team attended a commercial building to provide emergency patchwork repairs using liquid resin to a flat roof to prevent short term water ingress.
Line Marking
Our groundworks team attended following a health and safety review and improved the marking for pedestrians in a commercial carpark.
Digital Lock
We attended site following a fire risk assessment and fitted a digital lock to the common parts electrical riser.