Our refurbishment team attended a commercial office building to carry out redecoration whilst the office had low volume due to home working. They
– prepared walls behind Main Reception for decoration
– raked out all cracks on walls and filled all damages
– sanded and dusted off all filled areas
– painted walls behind Main Reception with 2 coats of existing light grey wall emulsion
– prepared skirting boards behind Main Reception for decoration
– filled skirting where necessary, sanded and dusted off filled areas
– painted skirting with 2 coats of white acrylic eggshell paint
– protected and cleaned entire working areas
RECENT JOBS
Wall Construction
Reactive maintenance - our groundworks team attended a business park to reconstruct a wall that had been damaged by a vehicle, reusing existing brickworks where possible.
Repair of mag lock
Our locksmith attended commercial premises as the mag lock essential for security of the site had broken. The problem was fixed within 2 hours.
New street lights
Electrical installation team fitted 3 new 6 meter street lights in commercial office car park with LEDs. This included groundwork in order to install new electrical cabling for the lights.
Installation palisade fence
Planned maintenance team installed a fabricated palisade fence at an industrial site in order to enhance the security of the site.
Installation Aco drain
Groundworks team installed removed existing damaged drainage channel and installed new ACO drain.
Refurbishment of Fire Escape
As part of a planned maintenance schedule in response to a Fire Risk Assessment we cleaned , applied non slip finish , highlighted nosings, painted fire door and applied D-handle to fire escape and fire exit.