Our refurbishment team attended a commercial office building to carry out redecoration whilst the office had low volume due to home working. They
– prepared walls behind Main Reception for decoration
– raked out all cracks on walls and filled all damages
– sanded and dusted off all filled areas
– painted walls behind Main Reception with 2 coats of existing light grey wall emulsion
– prepared skirting boards behind Main Reception for decoration
– filled skirting where necessary, sanded and dusted off filled areas
– painted skirting with 2 coats of white acrylic eggshell paint
– protected and cleaned entire working areas
RECENT JOBS
Installation of steel mesh
Installation of steel mesh - Are your fire exits secure from unauthorised access?
Relaying of Roof to Prevent Water Ingress
Sometimes the original design of a roof can be altered at little cost compared to a new roof to mitigate water ingress.
Temporary Liquid Resin Treatment
The application of liquid resin to areas suffering water ingress can be an efficient and cost effective approach pending more substantial investment.
Relay of Carpet
Loose carpet can be a trip hazard and is easily corrected.
Installation of Bollards
Installing bollards to prevent damage to walls can reduce longer term costs.