Our groundworks team attended a commercial centre in order to repair damaged kerb stones on an access road. They broke out the damaged kerb stones and disposed of. Supplied and installed 2 new bullnose kerb stones then repaired the tarmac with cold lay tarmac where required
RECENT JOBS
Relaying of Roof to Prevent Water Ingress
Sometimes the original design of a roof can be altered at little cost compared to a new roof to mitigate water ingress.
Temporary Liquid Resin Treatment
The application of liquid resin to areas suffering water ingress can be an efficient and cost effective approach pending more substantial investment.
Relay of Carpet
Loose carpet can be a trip hazard and is easily corrected.
Installation of Bollards
Installing bollards to prevent damage to walls can reduce longer term costs.
Replacement Door Handle
Emergency replacement of door handle.








