Our groundworks team attended a commercial centre in order to repair damaged kerb stones on an access road. They broke out the damaged kerb stones and disposed of. Supplied and installed 2 new bullnose kerb stones then repaired the tarmac with cold lay tarmac where required
RECENT JOBS
Glass Pane
Emergency replacement of cracked pane of glass at commercial building.
Speed Limit Sign
Installation of speed limit sign to ensure safe traffic flows at industrial site.
Concrete Trip Hazards
Concreting of trip hazards - The swift identification and rectifying of any trip hazards can prevent any injury or claims occurring
Highlighting of Steps
Highlighting of steps in order to prevent trip hazards and potential accidents.
Securing of Bike Shed
Fitting slats to open section of a bike store and new lock : Preventative measures to prevent fly tipping and secure open areas can save clearance costs.








