Our groundworks team attended an industrial site to dig and replace broken kerbs. Removed broken kerb , cleaned out base ready for new kerbs and lowered in 2 radius and 1 straight kerb
RECENT JOBS
Perimeter Fence
Installation of perimeter fencing
Installation of Bollards
Installation of Bollards.
Lighting Ornamental Stone
Lighting the ornamental stone bearing a shopping centre name.
External Steps
Repair of step to remove trip hazard.
Steel Edge Protection
Installation of plant, edge and isolation switch protection and gates.