Our carpet fitters attended a commercial site to:
Remove an existing flooring and dispose
Prime floor ready for new covering
Lay self levelling rapid set latex to whole area
Supply and lay polysafe sheet vinyl with cap and coved upstands
RECENT JOBS
Preparation for New Tennants
Workman attended to ensure that all signage left by previous tenant was removed in preparation for new tenants’ arrival.
Locksmith / Window Locks
A locksmith attended to ensure that window locks operated effectively and hence were effective in securing the building.
Installation of Fire Doors
Installation of fire doors - SPA have a number of years experience of responding to Fire risk assessments and Health and Safety surveys.
Maintenance of Delivery Access
Servicing and maintenance of ground floor delivery doors including door adjustment , sealing strip to prevent heat loss and re positioning of gears.








