Our reactive maintenance team attended a commercial centre in order to investigate and solve a water ingress issue
‘ We attended site as proposed, after a visual inspection internally, we related it to the box gutter externally – after sweeping and cleaning the box gutter area we were then able to carry out an inspection of the gutter lining – we found a tear at the upstand interface, local to the internal ingress staining. As such we heat applied a roof sealing patch to the length of the gutter bay, we also mastic pointed the upstand to brickwork interface.’‘
RECENT JOBS
Lobby decoration
Our decorating team attended a commercial premises in order to decorate the citing and stairwells of the large lobby area.
Light repair in car park
Our electrical team attended site and isolated electrical supply to light fittings.
EICR wiring certificate
Our electrical team attended site in order to test and provide an EICR on 3 36 way 3 phase distribution boards.
Palisade fence repairs at industrial site
Our reactive maintenance team for repair works carried out to palisade gates to the front of unit of 4 adjusting gates to allow locking eyes to line up.
Decoration of residential flat
Our decorating team attended site in order to redecorate all walls of a residential flat following a change of tenancy.
‘One stop shop’ – Health and safety – roofing – electrics – decorating
Our multi skilled team attended a commercial premises in order to fulfil a number of ‘handyman’ jobs in one visit highlighted in a health and safety assessment and tenant.