Our reactive maintenance team attended a commercial centre in order to investigate and solve a water ingress issue
‘ We attended site as proposed, after a visual inspection internally, we related it to the box gutter externally – after sweeping and cleaning the box gutter area we were then able to carry out an inspection of the gutter lining – we found a tear at the upstand interface, local to the internal ingress staining. As such we heat applied a roof sealing patch to the length of the gutter bay, we also mastic pointed the upstand to brickwork interface.’‘
RECENT JOBS
Roof repair
Our reactive maintenance team attended a commercial property in order to repair a flat roof after water ingress and been noticed.
Step nosing
Our planned maintenance team attended a commercial site in order to highlight a potential hazard identified by a health and safety report.
Manhole repair
Our planned maintenance team attended an industrial park in order to repair a damaged manhole frame.
Removal of graffiti
Our reactive maintenance team attended a commercial premises to remove graffiti that had little artistic merit.
Light installation
Our planned maintenance team attended an industrial centre to Install 3 PIR sensor lights
Bracket replacement for screens shielding car park
Our planned maintenance team attended a car park at a commercial centre in order to replace the brackets holding in place the shielding screens for the multi storey car park.