Our reactive maintenance team attended a commercial centre in order to investigate and solve a water ingress issue
‘ We attended site as proposed, after a visual inspection internally, we related it to the box gutter externally – after sweeping and cleaning the box gutter area we were then able to carry out an inspection of the gutter lining – we found a tear at the upstand interface, local to the internal ingress staining. As such we heat applied a roof sealing patch to the length of the gutter bay, we also mastic pointed the upstand to brickwork interface.’‘
RECENT JOBS
Lock Change
Our reactive maintenance team attended a commercial premises due to a broken lock preventing access.
Canteen refurbishment
Our refurbishment team attended the canteen of a commercial premises.
Damaged wall due to plant growth
Our reactive maintenance team attended a commercial premises where there was plant growth damaging a rear wall.
Refurbishment
Planned maintenance of stairwell of commercial building.
Clearance of fire escape
In response to a Fire Risk Assessment our reactive maintenance team attended an industrial site.
Hand sanitiser installation
Our preventative maintenance team installed hand sanitiser and signage throughout a commercial premises to ensure that health and safety guidance relating to the corona was followed and the premises were COVID-19 SECURE .