Our reactive maintenance team attended a commercial centre in order to investigate and solve a water ingress issue
‘ We attended site as proposed, after a visual inspection internally, we related it to the box gutter externally – after sweeping and cleaning the box gutter area we were then able to carry out an inspection of the gutter lining – we found a tear at the upstand interface, local to the internal ingress staining. As such we heat applied a roof sealing patch to the length of the gutter bay, we also mastic pointed the upstand to brickwork interface.’‘
RECENT JOBS
Fire extinguisher installations
In response to a Fire risk Assessment our reactive maintenance team attended an industrial complex. They installed fire extinguishers and suitable signage through out the unit.
Hand sanitiser station
Or reactive team visited a commercial office in order to supply and instal a hand sanitiser station to ensure that the site complied with the Health and Safety guidance to combat the corona.
Signage to ensure building corona ready
Our reactive team attend a client site and fixed signage throughout the building to ensure compliance with all health and safety requirements prior to the premises being reoccupied post corona.
Corona Ready Office
Our reactive team visited a commercial office to install star signage, lift signage, screens and sanitiser stations.
Refurbishment of retail premises
Our refurbishment team attended a retail premises that was closed due to the corona.
Refurbishment
Our refurbishment team team attended a commercial premises to take advantage of the areas being quiet during the corona lock down period