Our reactive maintenance team attended a commercial centre in order to investigate and solve a water ingress issue
‘ We attended site as proposed, after a visual inspection internally, we related it to the box gutter externally – after sweeping and cleaning the box gutter area we were then able to carry out an inspection of the gutter lining – we found a tear at the upstand interface, local to the internal ingress staining. As such we heat applied a roof sealing patch to the length of the gutter bay, we also mastic pointed the upstand to brickwork interface.’‘
RECENT JOBS
Fixing Corona screens to reception
Our reactive team visited a commercial property in order to fix screens at the reception area in order to protect reception and visitors from the corona once the building reopened.
Fire door replacement
Our preventative maintenance team attended a retail centre in response to a Fire Risk Assessment.
Fire stopping
Our preventative maintenance team attended a retail centre in response to a Fire Risk Assessment.
Replacement of glass on 3 story building
Our working at heights planned maintenance team cut out glazing from 3rd floor.
Refurbishment of fence rail / sub station and block paving
Our planned maintenance team attended a retina site and renewed the wooden knee rail fence...
Groundworks business centre
Our groundworks team attended site - lifted areas of dropped and risen block paving that had created a trip hazard in the car park...