Our reactive maintenance team attended a commercial centre in order to investigate and solve a water ingress issue
‘ We attended site as proposed, after a visual inspection internally, we related it to the box gutter externally – after sweeping and cleaning the box gutter area we were then able to carry out an inspection of the gutter lining – we found a tear at the upstand interface, local to the internal ingress staining. As such we heat applied a roof sealing patch to the length of the gutter bay, we also mastic pointed the upstand to brickwork interface.’‘
RECENT JOBS
Office door repair
Our maintenance team were asked to urgently attend a commercial building where the lock had been tampered with, creating a security issue.
Rubbish Clearance
Our reactive maintenance team were happy to attend a retail park to clear rubbish.
Preventing water ingress
Our commercial roofing team attended a Greater London commercial building to prevent water ingress
Fire Stopping
Our planned maintenance team attended a commercial site where a fire risk assessment had identified some weakness in the fire stopping of the basement electrical cupboard.
Paving Replacement
Our groundworks team attended a retail centre due to a potential health and safety hazard.
Entrance door repairs
Our planned maintenance team attended a commercial building in Canary Wharf in order to service double glass doors which had not been operating correctly.