Our reactive maintenance team attended a commercial centre in order to investigate and solve a water ingress issue

‘ We attended site as proposed, after a visual inspection internally, we related it to the box gutter externally – after sweeping and cleaning the box gutter area we were then able to carry out an inspection of the gutter lining – we found a tear at the upstand interface, local to the internal ingress staining. As such we heat applied a roof sealing patch to the length of the gutter bay, we also mastic pointed the upstand to brickwork interface.’‘

RECENT JOBS

Car Park Barriers

Our planned maintenance team attended a retail park in response to a health and safety survey which had indicated that vehicle barriers appeared to be damaged and in disrepair. Our team dug out and replaced two barriers, reset three others and painted all including cutting back hedges that obscured.

2021-06-17T11:04:24+02:00
Go to Top