Our reactive maintenance team attended a commercial centre in order to investigate and solve a water ingress issue
‘ We attended site as proposed, after a visual inspection internally, we related it to the box gutter externally – after sweeping and cleaning the box gutter area we were then able to carry out an inspection of the gutter lining – we found a tear at the upstand interface, local to the internal ingress staining. As such we heat applied a roof sealing patch to the length of the gutter bay, we also mastic pointed the upstand to brickwork interface.’‘
RECENT JOBS
FRA Response
Our maintenance team attended a central London office to deal with recommendations post a Fire Risk Assessment. One of which was to relocate the fire extinguishers.
Groundworks
Our groundworks team reset and concreted in two bollards at an industrial site where HGVs had been colliding with the bollards previously.
Electrical Works
Our electrical installation team were asked to attend a business park to check the installation of a number of internal and external LED lights.
Roof Repairs
We attended a site at a commercial business park to carry out a brief roof inspection and then remedial works as considered necessary due to water ingress.
Office Decoration
Our planned maintenance team decorated an empty office as part of a refurbishment programme.
Graffiti Removal
Our reactive maintenance team attended an industrial site to remove graffiti.