Our reactive maintenance team attended a commercial centre in order to investigate and solve a water ingress issue
‘ We attended site as proposed, after a visual inspection internally, we related it to the box gutter externally – after sweeping and cleaning the box gutter area we were then able to carry out an inspection of the gutter lining – we found a tear at the upstand interface, local to the internal ingress staining. As such we heat applied a roof sealing patch to the length of the gutter bay, we also mastic pointed the upstand to brickwork interface.’‘
RECENT JOBS
Road Resurfacing
Road resurfacing at health club by digging out arisings laying concrete and then a top covering of tarmac.
Installation of ramp
Installation of ramp at office building as part of planned maintenance review following a heath and safety audit.
Installation of wooden fence replacement
Carpentry and security requirement - installing a wooden fence to prevent access to the site through a hedge by third parties.
Refurbishment
Refurbishment of central London office as part of a planned maintenance schedule. Decorating of walls and all wood.
LED Installation
Planned maintenance at an industrial trading site. Electrical installation to replace all existing light fittings with LED light fittings.
Height Restrictor
As part of a planned maintenance schedule we fabricated and fitted a height restrictor at a retail park to improve traffic management.