Our reactive maintenance team attended a commercial centre in order to investigate and solve a water ingress issue
‘ We attended site as proposed, after a visual inspection internally, we related it to the box gutter externally – after sweeping and cleaning the box gutter area we were then able to carry out an inspection of the gutter lining – we found a tear at the upstand interface, local to the internal ingress staining. As such we heat applied a roof sealing patch to the length of the gutter bay, we also mastic pointed the upstand to brickwork interface.’‘
RECENT JOBS
Step Repair
Ensuring that all internal steps are in good order prevents Health and safety risks.
Clearing Roof
Clearing of debris from roof of commercial building preventing water ingress and damage.
Highlighting
Highlighting of potential hazards post a health and safety assessment.
Installation of New Glass Canopy
Installation of new glass canopy over commercial building entrance.
Glass Pane
Emergency replacement of cracked pane of glass at commercial building.