Our planned maintenance team attended a business park in order to address a potential health and safety hazard caused by uneven slabs. They:
Lifted slabs
Cleaned
Created level base using sand
Relayed existing slabs ensuring level
Swept areas upon completion
RECENT JOBS
Outer Buildings Gutter Clean
Cleaning of gutters to prevent water ingress using spider boom and self propelled boom.
Preparation for New Tennants
Workman attended to ensure that all signage left by previous tenant was removed in preparation for new tenants’ arrival.
Locksmith / Window Locks
A locksmith attended to ensure that window locks operated effectively and hence were effective in securing the building.
Installation of Fire Doors
Installation of fire doors - SPA have a number of years experience of responding to Fire risk assessments and Health and Safety surveys.