Our planned maintenance team attended an industrial centre in response to a health and safety report to run a new cable from existing power supply clip below cladding around the side of the building and Install 3 PIR sensor lights along the fire escape
RECENT JOBS
Liquid resin treatment for roof
We attended a commercial premises for applying a liquid resin treatment to prevent water ingress.
Internal refurbishment
Our refurbishment team attended a commercial building.
Roof survey
Due to water ingress we carried out a detailed inspection.
Canteen refurbishment
Following a fire risk assessment that identified a hatch that was not fire rated our team attended and removed the hatch and replaced with one that met fire rating standards.
Drainage channel replacement
Our groundworks team attended a commercial premises.
Lock Change
Our reactive maintenance team attended a commercial premises due to a broken lock preventing access.