Our planned maintenance team attended an industrial centre in response to a health and safety report to run a new cable from existing power supply clip below cladding around the side of the building and Install 3 PIR sensor lights along the fire escape

RECENT JOBS

Groundworks

Groundworks team attended retail park in Peterborough to replace aco drain and channel. Broke out existing drain and channel and supplied and fitted new.

Groundworks

Groundwork team attended commercial car park to reset corner stone. Cleaned all old mortar from stone and cleaned base. Reset with new mortar.

Electrical

Electrician attended site and gained access to distribution board and found breaker had tripped. Reset breaker and checked lights.

Glazing

Supplied and fitted toughened and laminated safety glass double glazed unit to office window.

2021-03-14T15:04:14+02:00
Go to Top