Our planned maintenance team attended an industrial centre in response to a health and safety report to run a new cable from existing power supply clip below cladding around the side of the building and Install 3 PIR sensor lights along the fire escape
RECENT JOBS
Brickworks
Repair and Replacement of Brickworks
Take up decking – repair roof – clear gutters – replace decking
Take up decking - repair roof - clear gutters - replace decking.
Installation of roof railing
Installation of roof railing following health and safety review.
Installation of stair nosing
Installation of stair nosing at retail centre to prevent health and safety hazard.
Installation of floodlights and electrical testing
Installation of floodlights and electrical testing.
Replacement of Loose Slabs
Groundwork replacement of loose slabs at commercial office to prevent health and safety risk.