We attended a commercial premises in central London that we had quoted for applying a liquid resin treatment to prevent water ingress. On the visit, upon lifting the walkway tiles, we found several areas of cracks within the asphalt roof surface. We therefore treated the area as we had quoted as well as applying liquid resin around the support pads to the handrail system local to the water ingress staining area. (they had sunk into the Asphalt roof surface and therefore would also potentially be part of the issue).
RECENT JOBS
Fire extinguisher installations
In response to a Fire risk Assessment our reactive maintenance team attended an industrial complex. They installed fire extinguishers and suitable signage through out the unit.
Hand sanitiser station
Or reactive team visited a commercial office in order to supply and instal a hand sanitiser station to ensure that the site complied with the Health and Safety guidance to combat the corona.
Signage to ensure building corona ready
Our reactive team attend a client site and fixed signage throughout the building to ensure compliance with all health and safety requirements prior to the premises being reoccupied post corona.
Corona Ready Office
Our reactive team visited a commercial office to install star signage, lift signage, screens and sanitiser stations.
Refurbishment of retail premises
Our refurbishment team attended a retail premises that was closed due to the corona.
Refurbishment
Our refurbishment team team attended a commercial premises to take advantage of the areas being quiet during the corona lock down period