We attended a commercial premises in central London that we had quoted for applying a liquid resin treatment to prevent water ingress. On the visit, upon lifting the walkway tiles, we found several areas of cracks within the asphalt roof surface. We therefore treated the area as we had quoted as well as applying liquid resin around the support pads to the handrail system local to the water ingress staining area. (they had sunk into the Asphalt roof surface and therefore would also potentially be part of the issue).
RECENT JOBS
Malfunctioning Lock
Our reactive team responded to an urgent situation as the front door to a commercial office could not be closed due to a malfunctioning lock and presented a security risk . The lock was adjusted and the problem was resolved.
Refurbishment
Our refurbishment team attended and replaced missing plasterboard and filled as required and painted entire wall in white emulsion.
Brickwork Repair
Following the identification of a pillar in disrepair our reactive maintenance team attended site. They toothed out all broken brick work in the pillar and re-layed new bricks to rebuild the pillar.
Ground works post H&S review
Our groundwork team attended to repair broken paving slabs. This was following a heath and safety review which had identified them as slip hazards.
FRA Response
Our maintenance team attended a central London office to deal with recommendations post a Fire Risk Assessment. One of which was to relocate the fire extinguishers.
Groundworks
Our groundworks team reset and concreted in two bollards at an industrial site where HGVs had been colliding with the bollards previously.