We attended a commercial premises in central London that we had quoted for applying a liquid resin treatment to prevent water ingress. On the visit, upon lifting the walkway tiles, we found several areas of cracks within the asphalt roof surface. We therefore treated the area as we had quoted as well as applying liquid resin around the support pads to the handrail system local to the water ingress staining area. (they had sunk into the Asphalt roof surface and therefore would also potentially be part of the issue).
RECENT JOBS
Construction of smoking shelter and associated groundworks
Supplied, delivered and assembled an open fronted smoking shelter
Refurbishment / decoration of waste bin area
Our team attended a commercial office building for refurb and decorating
Electrical works
Our electricians attended a commercial office building due to a flatly floor socket. Tested socket - made safe. Returned to site and replaced damaged socket
Line Marking
Additional numbered parking was required at a retail site.
Repair of Totem sign at retail park
Carry out an initial survey of the totem sign utilising a powered access machine to assess the existing framework and fixings. Advised on additional supports required internally to add strength.
Roof and gutters
There were reports of water ingress effecting an industrial premises so our gutters team were sent to investigate.