We attended a commercial premises in central London that we had quoted for applying a liquid resin treatment to prevent water ingress. On the visit, upon lifting the walkway tiles, we found several areas of cracks within the asphalt roof surface. We therefore treated the area as we had quoted as well as applying liquid resin around the support pads to the handrail system local to the water ingress staining area. (they had sunk into the Asphalt roof surface and therefore would also potentially be part of the issue).
RECENT JOBS
Replacement of Lighting in Car Park
Reactive maintenance to restore lighting in carpark in order ensure security and health and safety on compromised.
Thermoplastic road markings
Application of thermoplastic road markings
Roof Repairs
Reactive maintenance commercial roof repair involving the sealing of up stands and joints in roof felting due to a roof leak.
Resetting of granite setts
Resetting of granite setts and road resurfacing on roadway at office building complex as part of planned preventive maintenance.
Installation of steel bollards
Installation of steel bollards to separate pedestrians at retail centre.
Installation of fabricated gate and fence
Fabrication of gates and fencing at industrial complex to enhance security as part of planned preventive maintenance programme.