We attended a commercial premises in central London that we had quoted for applying a liquid resin treatment to prevent water ingress. On the visit, upon lifting the walkway tiles, we found several areas of cracks within the asphalt roof surface. We therefore treated the area as we had quoted as well as applying liquid resin around the support pads to the handrail system local to the water ingress staining area. (they had sunk into the Asphalt roof surface and therefore would also potentially be part of the issue).
RECENT JOBS
Preparation for New Tennants
Workman attended to ensure that all signage left by previous tenant was removed in preparation for new tenants’ arrival.
Locksmith / Window Locks
A locksmith attended to ensure that window locks operated effectively and hence were effective in securing the building.
Installation of Fire Doors
Installation of fire doors - SPA have a number of years experience of responding to Fire risk assessments and Health and Safety surveys.
Maintenance of Delivery Access
Servicing and maintenance of ground floor delivery doors including door adjustment , sealing strip to prevent heat loss and re positioning of gears.