Our planned maintenance team attended an industrial park in order to repair a damaged manhole frame.
Moved man hole frame back into correct position. Concreted into position with a new concrete surround.
Shutterd in a concrete section on the hedge edge to prevent the frame moving out of position again.

RECENT JOBS

Groundworks

Attended commercial property, lifted slabs causing trip hazards and relayed them on a bed of fresh sharp sand. Removed loose kerb stone and relayed in rapid set concrete, topped with cold lay and bitumen spray.

2021-04-21T18:16:55+02:00
Go to Top