Our planned maintenance team attended an industrial park in order to repair a damaged manhole frame.
Moved man hole frame back into correct position. Concreted into position with a new concrete surround.
Shutterd in a concrete section on the hedge edge to prevent the frame moving out of position again.
RECENT JOBS
Street lighting repair
Our reactive maintenance team attended an industrial site to repair street lighting
Bike Shelter
Assemble and Install a gated bike shelter to encourage sustainability
Entrance Repair
Our reactive maintenance team attended a commercial office to repair the entrance
Speed bumps
Our reactive team attended a leisure complex to install new speed bumps
Paint edging
Our planned maintenance team attended an office building in response to a health and safety report.
Bathroom refurbishment
Our planned maintenance team attended a business park for a bathroom refurbishment