Our planned maintenance team attended an industrial park in order to repair a damaged manhole frame.
Moved man hole frame back into correct position. Concreted into position with a new concrete surround.
Shutterd in a concrete section on the hedge edge to prevent the frame moving out of position again.

RECENT JOBS

Groundworks

Groundworks team attended retail park in Peterborough to replace aco drain and channel. Broke out existing drain and channel and supplied and fitted new.

Groundworks

Groundwork team attended commercial car park to reset corner stone. Cleaned all old mortar from stone and cleaned base. Reset with new mortar.

Electrical

Electrician attended site and gained access to distribution board and found breaker had tripped. Reset breaker and checked lights.

Glazing

Supplied and fitted toughened and laminated safety glass double glazed unit to office window.