Our planned maintenance team attended an industrial park in order to repair a damaged manhole frame.
Moved man hole frame back into correct position. Concreted into position with a new concrete surround.
Shutterd in a concrete section on the hedge edge to prevent the frame moving out of position again.
RECENT JOBS
Carpark Refurbishment
Refresh of car park at commercial building.
Cleaning of External Areas
Cleaning and repair of external areas at commercial offices.
Traffic Control
Installation of traffic control signs at commercial site.
Stainless Steel Bollards
Fitting of bollards to protect pedestrian access to Marks and Spencer at retail center.
New Concrete Level
Repair of pavement after Health and Safety review to ensure no trip hazards.