Our planned maintenance team attended an industrial park in order to repair a damaged manhole frame.
Moved man hole frame back into correct position. Concreted into position with a new concrete surround.
Shutterd in a concrete section on the hedge edge to prevent the frame moving out of position again.
RECENT JOBS
Ensuring Christmas Happens
Visited site to ensure that all Christmas light sockets were operational!
Installation of Gate
Fabrication and installation of new double leaf gate.
Pre-Christmas Refresh
Painting of bike racks and handrails ready for Christmas shopping at retail centre
Sign Clean
Cleaning of sign at entrance to industrial park.
Winter Preparations
In preparation for winter - drains cleared and over hanging trees branches cut back to prevent leaves falling into drains.
Emergency Repair
Emergency 2 hour repair to damaged height restrictor at Oxford retail park.